
Blue Origin
Rocket
New Glenn
Location
Launch Complex 36A
Launch Time
Sunday, January 31, 2027 at 12:00 AM GMT+0
Orbit
Geostationary Transfer Orbit
Countdown to Launch
The first mission of Blue Ring, Blue Origin's all-in-one, high-powered hybrid solar electric and chemical propelled spacecraft, will test the spacecraft's operations in Geostationary Transfer Orbit (GTO), as well as subsequent operations after reaching Geostationary Orbit (GEO). It will carry one of Scout Space's flagship next-generation space domain awareness (SDA) Owl sensors, which is designed to enhance real-time tracking, characterization, and assessment of space objects by integrating advanced optical sensing, onboard artificial intelligence-driven processing, and autonomous decision-making capabilities to deliver domain-wide intelligence in space in support of the U.S. Space Force’s space control mission set. Blue Ring will also carry Optimum Technologies (OpTech)'s next-generation Caracal optical payload, which is designed to provide actionable insights on resident space objects and orbital activity and includes onboard image storage, object detection algorithms, and passive thermal control. The payload is designed to operate flexibly across dynamic orbits over a year-long mission profile. Several internal Blue Origin payloads will also be hosted.
Launch Viewing Score
9.4/10
Excellent
Temp
82°F
Clouds
4%
Wind
8 mph
Visibility
83 km

East Aurora, N.Y. — Moog Inc. (NYSE: MOG.A and MOG.B) marks 25 years since the Evolved Secondary Payload Adapter (ESPA) ring completed its Critical Design Review in 2001. The pioneering […] The post Moog Marks 25 Years Since ESPA Design Milestone: Innovating Space Rideshare appeared first on SpaceNews.

(Karlsruhe, Germany, September 29th 2026) Horizon Microtechnologies is accelerating industrialisation of its metallised polymer micro-additive manufacturing platform through IP-MASS, a two-year scale-up project supported by €500,000 and reinforced by selection […] The post Horizon Microtechnologies Targets Constellation-Scale Production As Esa Phi-Lab Selection Strengthens Industrialisation Push appeared first on SpaceNews.

A fire at an external contractor’s facility has delayed the installation of a containerised greenhouse designed to simulate growing crops on the Moon. According to a response to a parliamentary inquiry published by the German Bundestag on 20 October, a fire occurred while the EDEN-LUNA greenhouse container was being refurbished. The incident has pushed back […] The post Fire Damage Delays Installation of Simulated Lunar Greenhouse in Germany appeared first on European Spaceflight.
Made with Emergent