The PMA Project
Back to Launches
Vulcan VC6L
Go for Launch

United Launch Alliance

Vulcan VC6L | Amazon Leo (LV-01)

Rocket

Vulcan VC6L

Location

Space Launch Complex 41

Launch Time

Friday, November 13, 2026 at 5:54 PM GMT+0

Orbit

Low Earth Orbit

Countdown to Launch

01
Days
23
Hours
10
Min
13
Sec

Mission Details

Amazon Leo, formerly known as Project Kuiper, is a mega constellation of satellites in Low Earth Orbit that will offer broadband internet access, this constellation will be managed by Kuiper Systems LLC, a subsidiary of Amazon. This constellation is planned to be composed of 3,276 satellites. The satellites are projected to be placed in 98 orbital planes in three orbital layers, one at 590 km, 610 km and 630 km altitude. 45 satellites will be carried on each Vulcan launch.

Launch Viewing Conditions

Weather Conditions

Launch Viewing Score

6.1/10

Good

Temp

82°F

Clouds

71%

Wind

7 mph

Visibility

85 km

Related News

Moog Marks 25 Years Since ESPA Design Milestone: Innovating Space Rideshare
SpaceNews
Nov 11, 2026

Moog Marks 25 Years Since ESPA Design Milestone: Innovating Space Rideshare

East Aurora, N.Y. — Moog Inc. (NYSE: MOG.A and MOG.B) marks 25 years since the Evolved Secondary Payload Adapter (ESPA) ring completed its Critical Design Review in 2001. The pioneering […] The post Moog Marks 25 Years Since ESPA Design Milestone: Innovating Space Rideshare appeared first on SpaceNews.

Read More
Horizon Microtechnologies Targets Constellation-Scale Production As Esa Phi-Lab Selection Strengthens Industrialisation Push
SpaceNews
Nov 11, 2026

Horizon Microtechnologies Targets Constellation-Scale Production As Esa Phi-Lab Selection Strengthens Industrialisation Push

(Karlsruhe, Germany, September 29th 2026) Horizon Microtechnologies is accelerating industrialisation of its metallised polymer micro-additive manufacturing platform through IP-MASS, a two-year scale-up project supported by €500,000 and reinforced by selection […] The post Horizon Microtechnologies Targets Constellation-Scale Production As Esa Phi-Lab Selection Strengthens Industrialisation Push appeared first on SpaceNews.

Read More
Fire Damage Delays Installation of Simulated Lunar Greenhouse in Germany
European Spaceflight
Nov 11, 2026

Fire Damage Delays Installation of Simulated Lunar Greenhouse in Germany

A fire at an external contractor’s facility has delayed the installation of a containerised greenhouse designed to simulate growing crops on the Moon. According to a response to a parliamentary inquiry published by the German Bundestag on 20 October, a fire occurred while the EDEN-LUNA greenhouse container was being refurbished. The incident has pushed back […] The post Fire Damage Delays Installation of Simulated Lunar Greenhouse in Germany appeared first on European Spaceflight.

Read More

Made with Emergent