The PMA Project
Back to Launches
New Glenn
To Be Determined

Blue Origin

New Glenn | BlueBird Block 2

Rocket

New Glenn

Location

Launch Complex 36A

Launch Time

Thursday, December 31, 2026 at 12:00 AM GMT+0

Orbit

Low Earth Orbit

Countdown to Launch

49
Days
05
Hours
06
Min
04
Sec

Mission Details

AST SpaceMobile’s Block 2 BlueBird satellites are designed to deliver up to 10 times the bandwidth capacity of the BlueBird Block 1 satellites, required to achieve 24/7 continuous cellular broadband service coverage in the United States, with beams designed to support a capacity of up to 40 MHz, enabling peak data transmission speeds up to 120 Mbps, supporting voice, full data and video applications. The Block 2 BlueBirds, featuring as large as 2400 square foot communications arrays, will be the largest satellites ever commercially deployed in Low Earth orbit once launched. This launch will feature 8 satellites.

Webcast link pending

Launch Viewing Conditions

Weather Conditions

Launch Viewing Score

9.4/10

Excellent

Temp

82°F

Clouds

4%

Wind

8 mph

Visibility

83 km

Related News

Moog Marks 25 Years Since ESPA Design Milestone: Innovating Space Rideshare
SpaceNews
Nov 11, 2026

Moog Marks 25 Years Since ESPA Design Milestone: Innovating Space Rideshare

East Aurora, N.Y. — Moog Inc. (NYSE: MOG.A and MOG.B) marks 25 years since the Evolved Secondary Payload Adapter (ESPA) ring completed its Critical Design Review in 2001. The pioneering […] The post Moog Marks 25 Years Since ESPA Design Milestone: Innovating Space Rideshare appeared first on SpaceNews.

Read More
Horizon Microtechnologies Targets Constellation-Scale Production As Esa Phi-Lab Selection Strengthens Industrialisation Push
SpaceNews
Nov 11, 2026

Horizon Microtechnologies Targets Constellation-Scale Production As Esa Phi-Lab Selection Strengthens Industrialisation Push

(Karlsruhe, Germany, September 29th 2026) Horizon Microtechnologies is accelerating industrialisation of its metallised polymer micro-additive manufacturing platform through IP-MASS, a two-year scale-up project supported by €500,000 and reinforced by selection […] The post Horizon Microtechnologies Targets Constellation-Scale Production As Esa Phi-Lab Selection Strengthens Industrialisation Push appeared first on SpaceNews.

Read More
Fire Damage Delays Installation of Simulated Lunar Greenhouse in Germany
European Spaceflight
Nov 11, 2026

Fire Damage Delays Installation of Simulated Lunar Greenhouse in Germany

A fire at an external contractor’s facility has delayed the installation of a containerised greenhouse designed to simulate growing crops on the Moon. According to a response to a parliamentary inquiry published by the German Bundestag on 20 October, a fire occurred while the EDEN-LUNA greenhouse container was being refurbished. The incident has pushed back […] The post Fire Damage Delays Installation of Simulated Lunar Greenhouse in Germany appeared first on European Spaceflight.

Read More

Made with Emergent